Deck Waterproofing North Shore: A Glenfield Case Study

A concrete deck leaking into the room below, sealed in three days. By Alex Salikov of Auckland Waterproofing Experts.

A concrete deck built directly over a room in Glenfield, on Auckland’s North Shore, was letting water into the room below. The job came to us through the property manager. Here’s what we found, what we did over three days in July 2026, and what it means if your own deck sits over living space.

The problem: a deck leaking into the room below

A deck over a room leaves no room for error. When the waterproofing fails, the water has nowhere to go but into the space underneath.

At this Glenfield property, the leak was showing in the room under the deck. On inspection we found several areas of concern. As a result we recommended fully re-coating the deck with Nuralite Nuradeck.

What we did

After a careful examination, we carried out repairs and applied Nuradeck, a fibreglass-reinforced liquid membrane system, over the concrete deck. The work took three days.

Day 1: preparation

  • Cleaning the deck
  • Waterblasting the surface
  • Fixing holes and other defects in the concrete

A liquid membrane needs a clean, sound surface to bond to, so this step gets a full day.

First coat with fibreglass reinforcement

The first coat of liquid membrane went down with fibreglass reinforcement set into it.

Second coat

The second coat then went over the top to complete the membrane.

The result

The work was finished in late July 2026. After careful examination and repairs, plus two coats of fibreglass-reinforced liquid membrane, the leak has stopped.

Finished fibreglass-reinforced liquid membrane on a concrete deck over a room in Glenfield, North Shore
The finished membrane on the Glenfield deck, late July 2026.

What it means for your deck

If you have a deck over a room anywhere on the North Shore or across Auckland, a few points from this job are worth knowing.

  • Act on a leak early. Water coming into a room under a deck means the deck or one of its junctions has let water through. The sooner it’s looked at, the less timber gets wet.
  • Edges matter as much as the middle. On this job the trouble was at the corner where the deck meets the cladding. That’s why we check the junctions, not just the open deck surface.
  • Liquid or sheet depends on the deck. Most of our deck work is TPO membrane. Liquids are often used for repairs, like this one, or over existing membranes. It always depends on the situation.
  • Rotten timber is its own job. A membrane keeps water out of the deck. Timber that has already rotted may still need replacing, and we’ll tell you when we see it.

For more on how we approach decks, see our deck waterproofing Auckland page. If your deck is concrete, our guide to concrete waterproofing in Auckland covers the options, and our applicator tips for deck membranes explain what good membrane work looks like.

Glenfield deck waterproofing FAQ

How long did the Glenfield deck waterproofing take?

Three days. Day 1 was preparation: cleaning, waterblasting and fixing holes. Then came the first coat with fibreglass reinforcement, followed by the second coat.

Why a full Nuradeck recoat?

We found several areas that looked questionable. A full recoat with Nuralite Nuradeck was the cleanest long-term solution — one continuous, reinforced membrane across the whole deck instead of a series of patches.

Deck leaking on the North Shore?

Worried your deck is leaking into the room below?

You can also read our waterproofing FAQs.