Section 72 Notice: What It Means for Your Title and Insurance
Guidance on natural hazard title entries, by Alex Salikov of Auckland Waterproofing Experts
A section 72 notice is an entry on a property’s record of title saying the land is subject to, or likely to be subject to, a natural hazard. People also call it a natural hazard notice or a section 73 entry. It usually turns up when you’re buying a house, or when the council tells you it will only consent your building work “under section 72”.
This guide explains where the notice comes from in the Building Act, what it means for your title and your insurance, and how one can come off again. It is general information, not legal advice.
Where a section 72 notice comes from
The rules sit in sections 71 to 74 of the Building Act 2004. They only apply when a building consent is needed for a new building or major alterations to an existing one, on land that is subject to, or likely to be subject to, a natural hazard (MBIE natural hazard provisions guidance).
Section 71 lists the hazards that count: erosion, falling debris, subsidence, inundation (including flooding, overland flow, storm surge, tidal effects and ponding) and slippage. The council must refuse consent on hazard land unless “adequate provision” has been made to protect the land, the building work and other property.
Section 72 is the exception. If the work won’t make the hazard worse or create a new one, the council can still grant consent even though adequate provision can’t be made. Section 73 then requires it to notify the Registrar-General of Land, and section 74 has the hazard entered on the title. That entry is what most people mean by a section 72 notice.
Three ways a consent on hazard land can go
MBIE has made this point clearly in two determinations this year. A council has three options with hazard land: refuse consent under section 71(1), grant it in the normal way under section 49 because adequate provision has been made, or grant it under section 72 with the title entry. The normal grant comes first, and section 72 is the alternative (Determination 2026/031).
In that case, a Tararua council said it would only consent a new outbuilding under section 72, based on modelling for a 0.5% annual exceedance probability (AEP) flood, a 1-in-200-year event. The owners were worried about their property value and insurance premiums.
MBIE disagreed with the council. It uses the 1% AEP event as the yardstick for “likely” over a 50-year building life. That event has roughly a 40% chance of happening in 50 years. A 0.5% AEP event has about a 22% chance, which may happen but isn’t “likely”. MBIE also noted that adequate provision “does not mean the elimination of any possibility in all conceivable circumstances”. It reversed the council’s decision, so the consent goes through the normal route.
MBIE also said the Act doesn’t require a “natural hazard report” as such. What helps is proportionate information about where the water comes from, its path, depth, speed, extent and duration, and any mitigation. Depending on the job, that might come from a licensed building practitioner or a civil, geotechnical or hydrological engineer.
What a section 72 notice means for your title

The entry stays on the title and passes to every future owner. MBIE has said one purpose of the entry is to make buyers aware that the council gets statutory immunity from liability in return for allowing the building work (Determination 2026/035). MBIE’s guidance lists what can follow from a section 73 condition (MBIE guidance):
- future buyers are told about the hazard through the title
- the council is exempt from liability for damage caused by that hazard (section 392 of the Act)
- the Natural Hazards Commission can legally decline cover, depending on the hazard
- private insurers may decline or exclude cover
- banks may decline a mortgage.
If you’re checking a property for flood risk more broadly, our guide on overland flow paths and basements covers flood maps and what to look for on a LIM.
Natural hazard notices and insurance
The Natural Hazards Commission (formerly EQC) explains that a notice alerts buyers, banks, lenders and insurers to the hazard (NHC: section notices). If you make a claim for damage from the same type of hazard named in the notice, NHC looks at it case by case. It may be accepted in full, partly accepted or declined. A claim for a different type of hazard goes through the normal process.
Private insurers set their own terms on top of that. If you’re buying, ask your insurer before you go unconditional, and get any answer in writing.
BRANZ notes that insurers are moving towards risk-based pricing, so premiums more closely reflect the risks an individual property faces. It also says that if a title carries a notice limiting the liability of NHC or the council because of a natural hazard, the implications should be fully understood. And having insurance now doesn’t mean suitable or affordable cover will stay available over the life of the home (BRANZ: building with insurance in mind).
Can a section 72 notice be removed?
Yes, but only by the council. Under section 74, the entry comes off when the council tells the Registrar-General it is no longer needed. NHC has no say in removal (NHC).
MBIE’s guidance says removal is usually started by the owner. You’ll need evidence that the hazard no longer exists or that adequate provision has now been made, and that may mean a specialist report (MBIE guidance).
Determination 2026/035 shows how this can play out. A Christchurch house near the Heathcote River was consented in 2015 under section 72. The current owners asked the council to remove the condition, and it refused. MBIE accepted the land was still likely to flood. It found the fill, retaining walls, sealed surfaces, drainage channels and raised floor levels amounted to adequate provision, and it removed the section 72 condition. MBIE also noted the flood risk itself hadn’t changed since 2015. Only the modelling had been updated.
Two things from that case are worth knowing. Land being flood-prone is not enough on its own for a notice; the question is whether the work has made adequate provision. And MBIE said temporary flooding of access roads is not part of the section 71(2) test.
Where waterproofing fits, and where it doesn’t
Waterproofing manages water in the ground around your building. A tanked basement wall or a sealed slab keeps groundwater and seepage from coming through the structure. It doesn’t change the flood hazard on the land, and on its own it isn’t the kind of evidence that gets a notice removed. That decision rests on how the land, building work and other property are protected from the hazard, which usually needs an engineer’s input.
If you have a notice and water is getting into a below-ground room, that is still worth fixing. Our basement waterproofing Auckland service deals with water coming through walls and floors. For general questions about when waterproofing work needs a building consent, see our guide to membrane replacement and building consent.
Get advice for your property
Every title and every hazard is different. Before you buy, sell or apply to remove an entry, check with a lawyer or talk to your council.
Know what the notice means before you decide
A section 72 notice is a title entry with real consequences for insurance and lending, but it can sometimes be removed, and MBIE has made clear councils should start from a normal consent.